Via Flickr:
A Norfolk Southern engine passes the crews with Norfolk Southern as they install rubber on either side of the tracks as part of the work that took place on Thursday that closed State Street the entire day. Spikes were replaced, track was leveled and a new railroad crossing was installed. Every two years this major type of maintenance is scheduled.
(Podcast) Upgrade 631: Nessie Beneath the Waves
9 hours ago
No comments:
Post a Comment